BATTERSEA

 

Size: 110 m2
Programme: 9 months including garden works 

 

This tastefully designed and fully renovated 3-bedroom house at Holden Street SW1 is a proud emblem of the sheer quality of the work which we deliver to our clients. We completed a full redecoration that included new structure to reinforce the existing brick walls, layout reconfiguration, single-storey rear extension and a loft conversion. The Clients approach to design the interior of the house tastefully combined the high-end décor with an overall fine finish. The rear and the front gardens were entirely renovated improving the value of the house.

 

 

CHELSEA 

 

Task: bespoke furniture assembling and fitting 

Programme: 3 days 

 

It has been a pleasure having the opportunity to work with truly talented designer Mehbs Yaqub who has created these awesome pop art furniture. A bespoke dining table has been assembled and the cupboards were fitted hiding the radiators. The ice maker and the fridge have been integrated into the bespoke pop art home bar to the highest standard by our qualified craftsmen.

 

 

 

 

 

 

WEST HAMPSTEAD 

 

Size: 100 m2

Programme: 12 weeks 

 

In this lower ground one bedroom flat at Kingdon Road, NW6 we constructed 35m2 single-storey rear extension. A complex and technically challenging project which involved the excavation of 100 m3 of compacted heavy clay soil. The new layout enabled to transform the modest one bedroom flat into the spacious two-bedroom flat with two bathrooms and open plan kitchen. We replaced and leveled the ceiling, redesigned the bathrooms and a full refurbishment throughout the flat, front and rear garden is still ahead. 

MAIDA VALE

 

Project: Polyurethane resin flooring system

Size: 45 m2

Programme: 1 week 

 

Nothing can be more rewarding than a grateful and happy customer! We are glad to present this successfully completed resin floor project in a busy office in Maida Vale, W9. The polyurethane resin flooring system has been installed on 45 sq m meeting room floor. It was installed on plywood subfloor and covered with Matt sealer. Cost effective polyurethane flooring gives a seamless look and years of high performance!

 

 

MAYFAIR

 

Project: Multicoloured resin stairs

Programme: 5 days

 

Sketch is a quirky, 18th-century townhouse tea room that transforms into a cocktail lounge every evening in Mayfair. It's well known for its cosy atmosphere and breathtaking interior design. KESZ Construction was extremely happy to bring this creative multicoloured resin stairs project into life. We are ready for a new challenge!

 

 

 

FINSBURY PARK

 

Project: Refurbishment of a 2-bedroom flat

Size: 80m2 

Programme: 6 weeks 

 

Fully renovated 2-bedroom flat in Finsbury Park, N4! The scope of work included plastering, decoration, woodwork, installation of the new flooring, doors, kitchen, electrics, plumbing and garden decking installation in the patio. The whole project was completed in 6 weeks.

 

 

WIMBLEDON  

 

Size: 25 m2

Programme: 10 weeks 

 

The owners of this beautiful family house located in Wimbledon opted for more space in the kitchen area of the property, hence why we made an extension to it. The brand new bespoke kitchen was installed. The integrated roof windows above the dining area allowed for a good supply of natural sunlight. In addition, the entire heating system was replaced and new utility and guest WC was built.

 

 

 

DALSTON KINGSLAND

 

Size: 65 m2

Programme: 8 weeks 

 

The significant renovation job is done for this two bedroom flat at Bolls Pond Road, N1. This included converting the basement storage into the walk-in wardrobe, the tanking system has been used for the basement damp proofing. The two-bedroom two-bathroom maisonnette have been fully refurbished to the highest standard including new kitchen fitting and electrical refurbishment works.

 

 

 

 

 

 

NOTTING HILL 

 

Size: 37 m2
Programme: 3 weeks

 

In addition to our list of commercial clients would undoubtedly be this renovation project which we managed for Champions Estate Agents. Our client requested for renovation to be carried out for their office at Kensington Church Street. The project involved stripping the existing finishes and fitted furniture out, installation of new electrics, light fittings, and plumbing. The shop front was entirely renovated as part of the improvement scheme. 

 

 

CRICKLEWOOD

 

Size: 55m2 

Programme: 12 weeks 

 

This project involved the full-scale refurbishment and construction of the rear extension of the semi-detached house at Needham Terrace NW2. The construction programme included the removal of the two old chimneys, construction of the new rear extension, full refurbishment with an installation of the new electrics and plumbing, new kitchen fitting, external rendering, and gardening works.

 

 

 

 

PROJECTS UNDER CONSTRUCTION 

 

 

TOWER HILL 

 

Size: 107 m2
Programme: 2 months 

 

For this particular project located in the heart of Tower Hill we worked in collaboration with other teams. Our task as a part of the whole project involved strip out the existing building to its skeletal frames, reinforce the existing structure and raft foundation for the rear extension. The entirely new three-storey solid structure was build including loft conversion and new layout reconfiguration.

WIMBLEDON

 

Project: Loft Conversion

Size: 30m2
Term: 12 weeks